
Add to Cart
The parts is made by PM process, it export to USA and Europe.
1, What’s the PM technology?
Powder metallurgy (PM), sometimes referred to as powdered metal sintering, is a process for manufacturing metal parts by heating compacted metal powders just below their melting points. In other words, PM is a metal shaping process that creates near-net parts from powdered metal. Sometimes, the products, manufactured by PM, are known as sintered products.]
PM Technology Advantage/Features
It suit to mass production and have strong supply capacity, without environmental pollution. It suit to produce complex with porous, and its post treatment is less ,especially gear, one-time compacting, no cutting, and greatly reduce the production cost.
Company Advantage
1,Quality policy:
Zero defecets, doing things to be best in one time
Keeping improve and never stop pursuing perfect attitde
reducing cost, and contine improve the compition of products
2, Quality goal:
quality rate can achieve 98%
quality rate of half-finished products is 99%
the failure cost is <2%
3,Our all of products are suit ROHS standard, green parts, without any pollution.
FAQ
1.How to get a quotation?
Please send us drawings in igs, dwg, step etc. together with detailed PDF.
If you have any requirements, please note, and we could provide professional advice for your reference.
Customer Inquiry →Engineering Meeting →Cost Analysis →Sales Analysis →Quote to Customer
1-3 Work Days Only
Submit RFQ with complete commercial terms
2, What if we do not have drawing?
Samples would be available, and we would send you drawing to confirm.
Of course, we would ensure the safety of the drawing.
3. How to pay?
For small quantity, we could provide T/T, T/T commission will be added to the order.
For the big one, T/T is preferred.
4. How to ship?
For small quantity, we have cooperation with DHL, FEDEX, UPS etc
For big quantity, air or sea would be available for you to choose.
1, 100% inspection before shipment.
2, Satisfied packing, carton, wooden case, pallet,or according to your requirement.
3, Samples are within 15 days after the receipt of the deposit. production will be finished about 30-40 days after samples confirma
process | powder metallurgy technology |
applied software | pro-e, CAD, PDF |
material | iron alloy , stainless steel, tungsten alloy |
surface finish | black, oiled, high-frequency |
tolerance precision | ±0.02~0.05mm |
quality system | 100% inspection before shipment |
dimensions | as per customer's requests |
samples qty | 5-10 pcs(for free) |
certification | ISO 9001, TS 16949, IECQQC080000 |
packgae | plastic bag and carton or as customer's requests |
lead time | base on the qty of order(usually 40-45 days) |
WORKSHOP
INSPECTION EQUIPMENT
neutral packing , carbon packing, and as according to your requirements
all kind of automobile parts.
● ISO 9001:2009 ● ISO/TS 16949:2009 ● IECQ QC 080000
If you are interested in lock button, please send me 2D or 3D drawings, and then we will evaluate them and offer you a nice price