
Add to Cart
Stainless Steel MIM Door Lock Parts High Precision Lock Shifting Parts
OEM Lock Shifting Parts And Door Lock Assembly Parts With High Precision
process | metal injection molding, powder metallurgy |
applied software | pro-e, CAD, PDF |
material | iron alloy , stainless steel. ceramic, tungsten alloy |
surface finish | black, plating, PVD, polishing, sandblasting |
tolerance precision | ±0.02~0.1mm |
quality system | 100% inspection before shipment |
dimensions | as per customer's requirements |
samples qty | 5-10 pcs(for free) |
certification | ISO 9001, TS 16949, IECQQC080000 |
packgae | plastic bag and carton or as customer's requests |
lead time | base on the qty of order(usually 25-30days) |
FAQ
1. What is MIM technology ?
MIM (Metal Injection Molding) is a manufacturing technology that combines the shape making complexity of Plastic Injection Molding with the material flexibility of Powder Metallurgy.
2, What's the PM technology?
Powder metallurgy (PM), sometimes referred to as powdered metal sintering, is a process for manufacturing metal parts by heating compacted metal powders just below their melting points. In other words, PM is a metal shaping process that creates near-net parts from powdered metal. Sometimes, the products, manufactured by PM, are known as sintered products.
3. How to get a quotation?
Please send us drawings in igs, dwg, step etc. together with detailed PDF.
If you have any requirements, please note, and we could provide professional advice for your reference.
Customer Inquiry →Engineering Meeting →Cost Analysis →Sales Analysis →Quote to Customer
? 1-3 Work Days Only
? Submit RFQ with complete commercial terms
4. What if we do not have drawing?
Samples would be available, and we would send you drawing to confirm.
Of course, we would ensure the safety of the drawing.
5. How to pay?
For small quantity, we could provide T/T, T/T commission will be added to the order.
For the big one, T/T is preferred.
6. How to ship?
For small quantity, we have cooperation with DHL, FEDEX, UPS etc
For big quantity, air or sea would be available for you to choose.
Service:
1, 100% checking before shipment.
2, Satisfied packing, carton, pallet,or according to your requests.
3, Samples are within 30-45 days after the receipt of the deposit and the mold manufacture need 30-35 days. production will be finished about 25-30 days after samples confirma